Cold Brew Ventures –  2019 Install Complete Cold Brew Operation Equipment Auction – Wilmington, MA

Cold Brew Ventures –  2019 Install Complete Cold Brew Operation Equipment Auction – Wilmington, MA

Wilmington, MA

Removal Deadline: October 28th 2026 by EOD

Auction Opens:
00
Days
00
Hours
00
Minutes
00
Seconds

Lot 1 ends: October 7, 2026 11:00 am

FERMENTATION TANKS: 

  • 40 BBL (1,240 GAL.) S/S JACKETED TANK, NEW AGITATORS & MOTORS, WITH GLYCOL JACKETS, STEP-DOWN & PLATE FILTRATION (OVERALL DIMS.:  APROX. 167″ H x 108″ W x 105″ L) (LOCATED IN WILMINGTON, MA) 
  • 30 BBL (930 GAL.) S/S JACKETED TANK, WITH GLYCOL JACKETS, STEP-DOWN & PLATE FILTRATION (OVERALL DIMS.:  APROX. 158″ H x 92″ W x 95″ L) (LOCATED IN WILMINGTON, MA) 
  • 15 BBL (465 GAL.) S/S JACKETED TANK, WITH GLYCOL JACKETS, STEP-DOWN & PLATE FILTRATION (OVERALL DIMS.:  APROX. 167″ H x 108″ W x 105″ L) (LOCATED IN WILMINGTON, MA) 
  • 10 BBL (310 GAL.) S/S JACKETED TANK, WITH GLYCOL JACKETS, STEP-DOWN & PLATE FILTRATION(OVERALL DIMS.:  APROX. 94″ H x 62″ W x 72″ L) (LOCATED IN WILMINGTON, MA) 

COFFEE GRINDER

  • MPE GPX INDUSTRIAL 2-HP COFFEE GRINDER, WITH 35 LB. S/S INFEED HOPPER, WITH 220 VOLTS/3PHASE MOTOR (LOCATED IN WILMINGTON, MA) 

CIP SYSTEM: 

  • ABE (AMERICAN BEER EQUIPMENT) PORTABLE TWIN-TANK CIP SANITATION SYSTEM, WITH ASSOCIATED PUMPS & VALVES, INCLUDES (2) 40-GAL. SINGLE WALL S/S TANKS, APROX. 24″ DIA., MOUNTED ON S/S FAME (LOCATED IN WILMINGTON, MA) 

FILLING SYSTEM 

  • ACTIONPAC S/S WEIGH & FILL SYSTEM, WITH ACTIONPAC SEALER 

PASTEURIZATION SKID

  • GOODNATURE PASTEURIZATION SKID 

CONVEYANCE SYSTEM

  • PNEUMATIC COFFEE GROUNDS CONVEYOR SYSTEM, CEILING MOUNTED, WITH S/S INFEED HOPPER (LOCATED IN WILMINGTON, MA) 

PLANT SUPPORT

  • TRANSFER HOSES 
  • S/S TRIPLE BOWL SINK & (2) S/S SINK BOWL SINK 
  • REFRIGERATORS 
  • SEALERS
  • PALLET PLATFORM SCALE 
  • PUMPS & VALVES